Çanakkale Hotel Project

Projects

Çanakkale Hotel Project

Located in the heart of Çanakkale and now fully operational, the DoubleTree by Hilton stands out as the third hotel in Turkey to be equipped with Digital Key infrastructure. Built to Hilton’s international brand standards, the hotel complies with DNC, ASHRAE, ASTM, DIN and EN standards, and was prepared in line with QA Opening and FLS Test requirements ahead of its opening. Carefully constructed by SERBAN, which brought together its commitment to superior quality and its extensive engineering experience, the hotel has become one of the most sought-after addresses in Çanakkale thanks to its prominent location in the city and its distinctive design.

Contractor

SERBAN

Client

DoubleTree by Hilton

Project Area

15,600 m²

Start Date

2021

Delivery Date

2022

Location

Çanakkale