Red Haven (Edgnex by Damac & Vodafone Investment) |
İzmir / Türkiye |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
12 MW |
4 MW |
Ongoing |
|
Project Area |
White Space Area |
Role in the Project |
6.702 sqm |
2.157 sqm |
Design & Build Turnkey MEP, Data Hall Infrastructure Works |
|
European Data Center 3rd Module |
Tekirdağ / Türkiye |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
13 MW |
4,35 MW |
Ongoing |
|
Project Area |
White Space Area |
Role in the Project |
7.300 sqm |
2.650 sqm |
Design & Build Turnkey MEP, Data Hall Infrastructure Works |
|
Ankara Data Center 4th Module |
Ankara / Türkiye |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
13 MW |
4 MW |
Ongoing |
|
Project Area |
White Space Area |
Role in the Project |
5.450 sqm |
2.750 sqm |
Design & Build Turnkey MEP, Data Hall Infrastructure Works |
|
CES 3 |
Ankara / Türkiye |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
|
|
2023 - 2025 |
CES |
Project Area |
White Space Area |
Role in the Project |
38.205,36 sqm |
|
|
|
Boreas Technology Production Hub |
Tekirdağ / Türkiye |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
|
|
2023 - 2024 |
Boreas Technology |
Project Area |
White Space Area |
Role in the Project |
35.000 sqm |
|
|
|
Hotel Komana |
İstanbul / Türkiye |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
|
|
2021 - 2024 |
Serban |
Project Area |
White Space Area |
Role in the Project |
1.477 sqm |
|
|
|
TSK Eğitim Vakfı (TAF Education Foundation) Student Dormitory |
İstanbul / Türkiye |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
|
|
2021 - 2023 |
TSK Eğitim Vakfı |
Project Area |
White Space Area |
Role in the Project |
31.000 sqm |
|
|
|
DoubleTree by Hilton Çanakkale |
Çanakkale / Türkiye |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
|
|
2021 - 2022 |
DoubleTree by Hilton Çanakkale |
Project Area |
White Space Area |
Role in the Project |
15.600 sqm |
|
|
|
Factory and Administrative Building |
Ankara / Türkiye |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
|
|
2016 - 2016 |
CES |
Project Area |
White Space Area |
Role in the Project |
16.000 sqm |
|
|
|
CES Hab |
Ankara / Türkiye |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
|
|
|
CES |
Project Area |
White Space Area |
Role in the Project |
34.882 sqm |
|
|
|
Ballistic Test Center |
Ankara / Türkiye |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
|
|
2019 - 2019 |
CES |
Project Area |
White Space Area |
Role in the Project |
22.000 sqm |
|
|
|
Public Critical Facilities |
Türkiye |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
|
|
|
Serban |
Project Area |
White Space Area |
Role in the Project |
|
|
|
|
Data Center Campus |
Cologne / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
100,0 MW |
80,0 MW |
Ongoing |
|
Project Area |
Role in the Project |
Scope |
50.000 sqm |
Tech DD, Test Fit Planning, Preliminary Building Permit, Building Application |
General Planning |
|
Data Center with Office Building |
Cologne / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
20,0 MW |
16,0 MW |
Ongoing |
|
Project Area |
Role in the Project |
Scope |
15.000 sqm |
Tech DD, Test Fit Planning, Preliminary Building Permit, Building Application |
General Planning |
|
Data Center with Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
84,0 MW |
70,0 MW |
Ongoing |
|
Project Area |
Role in the Project |
Scope |
70.000 sqm |
Execution Planning |
General Planning |
|
Data Center with Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
24,0 MW |
16,0 MW |
Ongoing |
|
Project Area |
Role in the Project |
Scope |
15.000 sqm |
Execution Planning |
Architectural |
|
Data Center with Office Building |
Berlin / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
180,0 MW |
150,0 MW |
Ongoing |
|
Project Area |
Role in the Project |
Scope |
110.000 sqm |
Tech DD, Test Fit Planning, Building Application (expected) |
General Planning |
|
Data Center with Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
126,0 MW |
105,0 MW |
Ongoing |
|
Project Area |
Role in the Project |
90.000 sqm |
Tech DD, Test Fit Planning, Preliminary Building Permit |
|
Data Center with Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
100,0 MW |
80,0 MW |
Ongoing |
|
Project Area |
Role in the Project |
Scope |
48.000 sqm |
Construction Management |
Architectural |
|
Data Center with Office Building |
Berlin / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
9,6 MW |
7,5 MW |
Ongoing |
|
Project Area |
Role in the Project |
Scope |
5.500 sqm |
Tech DD, Test Fit Planning, Preliminary Building Permit |
General Planning |
|
Data Center with Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
46,0 MW |
38,0 MW |
Ongoing |
|
Project Area |
Role in the Project |
Scope |
31.000 sqm |
Tech DD, Test Fit Planning, Preliminary Building Application |
General Planning |
|
Data Center with Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
14,4 MW |
12,0 MW |
2017 - 2018 |
|
Project Area |
Role in the Project |
Scope |
11.400 sqm |
Execution Planning, Tendering, Construction Management |
Architectural |
|
Data Center with Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
14,4 MW |
12,0 MW |
2018 - 2019 |
|
Project Area |
Role in the Project |
Scope |
11.225 sqm |
Execution Planning, Tendering, Construction Management |
Architectural |
|
Data Center with Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
14,4 MW |
12,0 MW |
2018 - 2019 |
|
Project Area |
Role in the Project |
Scope |
11.225 sqm |
Execution Planning, Tendering, Construction Management |
Architectural |
|
Building Extension and Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
2,4 MW |
2,0 MW |
2018 |
|
Project Area |
Role in the Project |
Scope |
2.770 sqm |
Design & Permitting |
Architectural |
|
Data Center Campus |
Offenbach a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
450,0 MW |
350,0 MW |
2018 - 2019 |
|
Project Area |
Role in the Project |
Scope |
119.300 sqm |
Design, Permitting & Tendering |
General Planning |
|
Data Center with Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
45,0 MW |
32,0 MW |
2018 - 2019 |
|
Project Area |
Role in the Project |
Scope |
32.000 sqm |
Design & Permitting |
General Planning |
|
Conversion into a Data Center |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
0,0 MW |
0,0 MW |
2018 - 2019 |
|
Project Area |
Role in the Project |
Scope |
1.500 sqm |
Construction Management |
Architectural |
|
Data Center with Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
20,0 MW |
16,0 MW |
2017 - 2019 |
|
Project Area |
Role in the Project |
Scope |
20.000 sqm |
Design, Permitting, Execution Planning & Construction Management |
General Planning |
|
Building Extension and Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
12,5 MW |
10,0 MW |
2017 - 2019 |
|
Project Area |
Role in the Project |
Scope |
8.000 sqm |
Design, Permitting & Execution Planning |
Architectural |
|
Data Center with Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
18,5 MW |
14,0 MW |
2017 - 2019 |
|
Project Area |
Role in the Project |
Scope |
15.000 sqm |
Design, Permitting, Execution Planning & Construction Management |
Architectural |
|
Data Center with Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
7,8 MW |
6,5 MW |
2018 - 2019 |
|
Project Area |
Role in the Project |
Scope |
9.600 sqm |
Design, Permitting, Execution Planning & Construction Management |
General Planning |
|
Data Center with Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
7,8 MW |
6,5 MW |
2019 - 2020 |
|
Project Area |
Role in the Project |
Scope |
9.000 sqm |
Design & Permitting |
General Planning |
|
Data Center Campus |
Liederbach i.Ts. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
120,0 MW |
100,0 MW |
2021 |
|
Project Area |
Role in the Project |
Scope |
69.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
Data Center with Office Building |
Sulzbach / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
48,0 MW |
24,0 MW |
2021 - 2022 |
|
Project Area |
Role in the Project |
Scope |
19.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
Data Center Campus |
Dexheimc / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
800,0 MW |
670,0 MW |
2021 - 2023 |
|
Project Area |
Role in the Project |
Scope |
600.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
Data Center with Office Building |
Mainz / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
28,8 MW |
24,0 MW |
2022 |
|
Project Area |
Role in the Project |
Scope |
9.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
Data Center with Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
14,4 MW |
12,0 MW |
2022 |
|
Project Area |
Role in the Project |
Scope |
14.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
Data Center with Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
100,0 MW |
80,0 MW |
2023 |
|
Project Area |
Role in the Project |
Scope |
47.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
Data Center with Office Building |
Offenbach a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
14,4 MW |
12,0 MW |
2023 |
|
Project Area |
Role in the Project |
Scope |
13.200 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
Data Center Campus |
Cologne / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
230,0 MW |
190,0 MW |
2023 |
|
Project Area |
Role in the Project |
Scope |
123.000 sqm |
Tech DD, Test Fit Planning & Consulting, Audit |
General Planning |
|
Data Center with Office Building |
Barcelona / Spain |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
20,0 MW |
16,8 MW |
2023 - 2024 |
|
Project Area |
Role in the Project |
Scope |
15.000 sqm |
Tech DD, Design, Permitting & Project Management |
General Planning |
|
Data Center with Office Building |
Mainz / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
29,0 MW |
24,2 MW |
2023 |
|
Project Area |
Role in the Project |
Scope |
10.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
Data Center with Office Building |
Cologne / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
60,0 MW |
50,0 MW |
2023 - 2024 |
|
Project Area |
Role in the Project |
Scope |
45.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
Data Center with Office Building |
Cologne / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
60,0 MW |
50,0 MW |
2023 - 2024 |
|
Project Area |
Role in the Project |
Scope |
40.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
Data Center with Office Building |
İstanbul / Türkiye |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
40,0 MW |
32,0 MW |
2023 |
|
Project Area |
Role in the Project |
Scope |
30.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
Data Center with Office Building |
London / United Kingdom |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
86,0 MW |
72,0 MW |
2023 - 2024 |
|
Project Area |
Role in the Project |
Scope |
32.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
Data Center with Office Building |
London / United Kingdom |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
130,0 MW |
110,0 MW |
2023 - 2024 |
|
Project Area |
Role in the Project |
Scope |
85.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
Data Center with Office Building |
Milan / Italy |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
120,0 MW |
100,0 MW |
2023 |
|
Project Area |
Role in the Project |
Scope |
45.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
Data Center with Office Building |
Marseille / France |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
60,0 MW |
50,0 MW |
2024 |
|
Project Area |
Role in the Project |
Scope |
30.000 sqm |
Tech DD, Test Fit Planning & Consulting |
General Planning |
|
Data Center with Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
9,6 MW |
7,5 MW |
2022 - 2024 |
|
Project Area |
Role in the Project |
Scope |
5.000 sqm |
Tech DD, Test Fit Planning, Preliminary Building Permit |
Architectural |
|
Data Center with Office Building |
Cologne / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
9,6 MW |
7,5 MW |
2023 |
|
Project Area |
Role in the Project |
Scope |
12.000 sqm |
Tech DD, Test Fit Planning & Consulting |
Architectural |
|
Data Center with Office Building |
Leipzig / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
12,0 MW |
10,0 MW |
2023 - 2024 |
|
Project Area |
Role in the Project |
17.000 sqm |
Tech DD, Test Fit Planning & Consulting |
|
Data Center with Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
9,6 MW |
7,5 MW |
2023 - 2024 |
|
Project Area |
Role in the Project |
Scope |
11.000 sqm |
Execution Planning |
Architectural |
|
10 Edge Data Center with Offices |
Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
7,2 MW |
6,0 MW |
2022 - 2023 |
|
Project Area |
Role in the Project |
Scope |
7.000 sqm |
Design & Permitting Process Consulting |
Architectural |
|
Data Center with Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
54,0 MW |
45,0 MW |
2024 |
|
Project Area |
Role in the Project |
Scope |
50.000 sqm |
Tech DD & Consulting |
General Planning |
|
Data Center with Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
12,0 MW |
10,0 MW |
2023 - 2024 |
|
Project Area |
Role in the Project |
Scope |
9.000 sqm |
Tech DD, Test Fit Planning, Preliminary Building Permit |
General Planning |
|
Data Center with Office Building |
Norway |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
40,0 MW |
35,0 MW |
2023 |
|
Project Area |
Role in the Project |
Scope |
11.000 sqm |
Tech DD |
General Planning |
|
3 Edge Data Center with Offices |
Denmark |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
5,4 MW |
4,5 MW |
2023 |
|
Project Area |
Role in the Project |
Scope |
1.500 sqm |
Tech DD |
General Planning |
|
Data Center with Office Building |
Neu-Isenburg / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
9,6 MW |
7,5 MW |
2023 - 2024 |
|
Project Area |
Role in the Project |
Scope |
10.000 sqm |
Tech DD, Test Fit Planning, Preliminary Building Application |
Architectural |
|
Data Center with Office Building |
Frankfurt a.M. / Germany |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
12,0 MW |
10,0 MW |
2023 - 2024 |
|
Project Area |
Role in the Project |
Scope |
9.000 sqm |
Consulting |
Architectural |
|
Gebze Data Center Building 2nd Module Construction Project |
Kocaeli / Türkiye |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
10 MW |
3 MW |
2018 - 2018 |
|
Project Area |
White Space Area |
Role in the Project |
4.250 sqm |
2.000 sqm |
TURNKEY Construction MEP Works |
|
Gebze Data Center Building 3rd Module Construction Project |
Kocaeli / Türkiye |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
10 MW |
3 MW |
2018 - 2018 |
|
Project Area |
White Space Area |
Role in the Project |
4.250 sqm |
2.000 sqm |
TURNKEY Construction MEP Works |
|
European Data Center Building |
Tekirdağ / Türkiye |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
20 MW |
4 MW |
2019 - 2020 |
|
Project Area |
White Space Area |
Role in the Project |
43.000 sqm |
6.800 sqm |
TURNKEY Construction MEP, Data Hall Infrastructure Works |
|
Gebze Data Center Building 4th Module Construction Works Project |
Kocaeli / Türkiye |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
13 MW |
4 MW |
2021 - 2022 |
|
Project Area |
White Space Area |
Role in the Project |
4.250 sqm |
2.000 sqm |
Design & Build Turnkey MEP, Data Hall Infrastructure Works |
|
Gebze Data Center Building 5th Module Construction Works Project |
Kocaeli / Türkiye |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
13 MW |
4 MW |
2022 - 2023 |
|
Project Area |
White Space Area |
Role in the Project |
4.250 sqm |
2.000 sqm |
Design & Build Turnkey MEP, Data Hall Infrastructure Works |
|
Ankara Data Center 2nd Module |
Ankara / Türkiye |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
13 MW |
4 MW |
2022 - 2023 |
|
Project Area |
White Space Area |
Role in the Project |
5.450 sqm |
2.750 sqm |
TURNKEY Construction MEP, Data Hall Infrastructure Works |
|
Ankara Data Center 3rd & 7th Modules |
Ankara / Türkiye |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
13 MW |
4,9 MW |
2023 - 2024 |
|
Project Area |
White Space Area |
Role in the Project |
7.700 sqm |
2.840 sqm |
Design & Build Turnkey MEP, Data Hall Infrastructure Works |
|
European Data Center 2nd Module (in provisional acceptance phase) |
Tekirdağ / Türkiye |
|
MW Total Power |
IT Power |
Project Duration |
Customer |
13 MW |
4 MW |
2023 - 2024 |
|
Project Area |
White Space Area |
Role in the Project |
6.600 sqm |
2.200 sqm |
Design & Build Turnkey MEP, Data Hall Infrastructure Works |
|